Jr. Davis Construction Celebrates Completion of $82 Million Poinciana Boulevard Widening Project
October 2026 | Osceola County, Florida
Jr. Davis Construction Company (JDC) joined Osceola County officials and project partners to celebrate the completion of the $82 million Poinciana Boulevard Widening and Improvements Project, marking another major milestone in improving transportation infrastructure, connectivity, and mobility throughout Osceola County.
The project transformed approximately 5.7 miles of South Poinciana Boulevard between Trafalgar Boulevard and Pleasant Hill Road from a two-lane roadway into a four-lane corridor. This significant infrastructure investment provides additional roadway capacity, improves traffic flow, and enhances accessibility for residents, businesses, and commuters traveling through the growing Poinciana community.
Improving Mobility for a Growing Community
As the Poinciana community continues to grow, expanding roadway capacity and improving transportation efficiency remain essential to meeting the region’s increasing travel demands.
The completed Poinciana Boulevard corridor provides additional travel lanes, improved intersections, and enhanced pedestrian and bicycle facilities, creating a safer and more accessible roadway for motorists and surrounding communities.
The improvements are already delivering measurable results. According to Osceola County, peak-period travel times along the corridor have decreased by more than 32% compared to 2023, before construction began.
These improvements will help reduce congestion, improve daily commutes, and strengthen an important transportation connection serving southern Osceola County.
Project Scope
The Poinciana Boulevard Widening and Improvements Project included extensive roadway reconstruction, intersection enhancements, drainage improvements, and multimodal transportation infrastructure.
Key project improvements include:
- Approximately 5.7 miles of roadway widened from two lanes to four lanes
- New turn lanes and landscaped medians
- Upgraded traffic signals with Intelligent Transportation Systems (ITS) technology
- Stormwater drainage improvements
- ADA-compliant pedestrian sidewalks
- Shared-use path for pedestrians and cyclists
- Intersection and roadway safety enhancements
Together, these improvements create a more efficient and accessible transportation corridor designed to support the continued growth of the Poinciana community.
Celebrating Another Major Transportation Milestone
The ribbon-cutting ceremony brought together Osceola County leadership, representatives from Jr. Davis Construction, engineering partner ETM, county staff, and community stakeholders to recognize the successful completion of this important infrastructure investment.
Osceola County Commission Chairman and District 3 Commissioner Brandon Arrington led the celebration, highlighting another significant step forward in strengthening the county’s transportation network.
The completion of the Poinciana Boulevard Widening and Improvements Project reflects the collaboration, planning, and dedication of the teams involved in delivering infrastructure improvements that will benefit the community for years to come.

Jr. Davis Construction Poinciana Boulevard Widening Project Team
Building Central Florida’s Future
With the widening now complete, Poinciana Boulevard provides increased roadway capacity, improved traffic operations, and enhanced pedestrian and bicycle accessibility along one of the community’s important transportation corridors.
Jr. Davis Construction is proud to have contributed to this major infrastructure improvement and extends its appreciation to Osceola County, ETM, project partners, and the residents and businesses along the corridor for their collaboration and support throughout construction.
Jr. Davis Construction — Building the infrastructure that moves Central Florida forward.
About Jr. Davis Construction
Jr. Davis Construction is one of Central Florida’s leading heavy civil contractors, specializing in roadway, bridge, and transportation infrastructure. Since 1985, JDC has played a central role in expanding the region’s transportation network through major highway widenings, interchange improvements, and complex design-build projects throughout the greater Orlando area.
Headquartered in Central Florida, JDC is committed to delivering safe, high-quality infrastructure that supports mobility and long-term regional growth.
For more information, visit www.jr-davis.com.
Join Our Team
At JDC, we don’t just build roads, we build careers. From field operations to project management and engineering, our team plays a vital role in shaping Central Florida’s future.
Explore current opportunities at: Careers – Jr. Davis Construction Company
