Hoagland Boulevard

  • Year: 2012
  • Client: Osceola County
  • Location: Kissimmee
  • Contract Amount: $5,671,000
  • Details: Widening from a two-lane rural section to a four-lane divided urban section with bike lanes, sidewalks, bike path, sodded and raised concrete medians. Work includes excavation of on-site and off-site retention ponds, reuse water main, watermains, force mains, gravity walls with pedestrian handrail, lighting, signing, pavement markings and various intersection improvements.
 

East-West Road - From 33 at Pace Road, Polk County Parkway

  • Year: 2012
  • Client: FDOT - District 1
  • Location: Lakeland
  • Contract Amount: $21,118,971.00
  • Details: Design-Build of a new four-lane suburban roadway. The project has six miles of roadway including two million yards of earthwork, 40,000 LF of storm sewers and 300,000 SY of base and paving; 200,000 CY of surcharges and 125,000 SY of GeoTextile soil reinforcement.
 

Narcoossee Road (Boggy Creek to 417)

  • Year: 2011
  • Client: Lake Nona Boggy Creek, LLC
  • Location: Orlando
  • Contract Amount: $18,095,199
  • Details: 3.82 miles of six-lane divided urban reconstruction and included clearing, subsoil excavation, grading, stabilization, base, milling, retaining walls, box culverts, drainage, riprap, underground utilities.
 

John Young Parkway/Osceola Parkway

  • Year: 2011
  • Client: Osceola County
  • Location: Kissimmee
  • Contract Amount: $22,285,700
  • Details: The project consists of widening John Young Parkway two miles, from four to six lanes, including the flyover bridge at Osceola Parkway. Project included widening ½ mile of Osceola Parkway. The utility improvements for this project included the construction of a 16-inch reclaimed water main and 12-inch water main.
 

Wetherbee Road Phase 3 & OUC Conduit

  • Year: 2010
  • Client: Orange County BOCC
  • Location: Orlando
  • Contract Amount: $4,201,926.00
  • Details: 1 mile of 4 lane divided urban new road construction from the end of Phase II to Boggy Creek Road; clearing, subsoil excavation, embankment, grading, stabilization, base, milling, paving, retaining walls, drainage, riprap, underground conduit
 

Pace Road

  • Year: 2009
  • Client: Polk County BOCC
  • Location: Auburndale
  • Contract Amount: $3,311,362
  • Details: .86 Miles of Urban New Roadway Construction
 

Pineda Causeway Realignment Project

  • Year: 2009
  • Client: Brevard County BOCC
  • Location: Melbourne
  • Contract Amount: $5,588,937
  • Details: . 9 Miles of Urban/Rural Section Widening/Reconstruction and underground utilities West of Wickham Rd. to West of US 1
 

Narcoossee Road 1A (192 - 10th St)

  • Year: 2009
  • Client: Balfour Beatty/Osceola BOCC/City of St. Cloud
  • Location: St. Cloud
  • Contract Amount: $3,207,999.97
  • Details: . 38 Miles of 4 Lane Divided Urban Widening and Intersection Improvements and underground utilities from US 192 (SR 500) to 10th Street
 

Neptune Road Widening Ph 1

  • Year: 2009
  • Client: Osceola County BOCC
  • Location: Kissimmee
  • Contract Amount: $29,141,491
  • Details: 2.4 Miles of 4 Lane Divided Urban Widening/Reconstruction with Box Culvert Crossing thru Bass Slough and Pedestian Bridge, installed underground utilities for TWA
 

CR 54

  • Year: 2008
  • Client: Polk County BOCC
  • Location: Davenport
  • Contract Amount: $4,092,175
  • Details: New road construction from Ronald Reagan Parkway (CR 54) from West of Champions Gate Blvd. to West of I-4
 

Taft-Vineland Road Extension

  • Year: 2007
  • Client: Orange County BOCC
  • Location: Orlando
  • Contract Amount: $5,452,094.00
  • Details: 2 miles of single lane new road construction extending Taft Vineland Road from Culvert to US 441; extend .74 miles to John Young Parkway; a four lane divided road with 10'x12' Triple Barrell Box Culvert Crossing; clearing, excavation, embankment, grading, stabilization, base, milling, paving and drainage
 

Orange Ave Phase III Seg II & III

  • Year: 2005
  • Client: Orange County BOCC
  • Location: Orlando
  • Contract Amount: $14,669,332
  • Details: 1.8 miles of 6 lane reconstruction of Orange Avenue from Florida's Turnpike to Fairway Woods Blvd. including aquatic plants mitigation area and Realignment/reconstruction of a 2 mile, 6 lane segment of Orange Avenue from Zell Drive to Fairway Woods Blvd and Boggy Creek Bridge
 

CR 545 Realignment

  • Year: 2002
  • Client: Osceola County BOCC
  • Location: Kissimmee
  • Contract Amount: $1,862,427
  • Details: Urban New Roadway Construction
 

Curry Ford Road

  • Year: 2002
  • Client: Orange County BOCC
  • Location: Orlando
  • Contract Amount: $6,653,241
  • Details: Reconstruction of Curry Ford Road and Utilitiy Improvements Segment 1 Beltway to Dean Ridge Road and ramp to 417 including clearing, excavation, embankment, grading, stabilization, base, paving, drainage, utilities
 

Pleasant Hill Road Phase I, II & III - Reedy Creek Bridge

  • Year: 1999
  • Client: Osceola BOCC/Leware Const
  • Location: Kissimmee
  • Contract Amount: $5,775,405.00
  • Details: Urban Widening/Reconstruction with bridge over Reedy Creek
 

Old Lake Wilson Road

  • Year: 2012
  • Client: WG Mills/Osceola County BOCC
  • Location: Kissimmee
  • Contract Amount: $9,800,581.00
  • Details: Widening from a two-lane rural section to a four-lane divided urban section with bike lanes, sidewalks, bike path, sodded and raised concrete medians. Work includes excavation of on-site and off-site retention ponds, reuse water main, watermains, force mains, gravity walls with pedestrian handrail, lighting, signing, pavement markings and various intersection improvements.
 

West New Nolte Road

  • Year: 2012
  • Client: Turner Construction/City of St. Cloud
  • Location: Saint Cloud
  • Contract Amount: $7,033,437.00
  • Details: New road construction of 3.1 miles of 4 lane divided roadway with ponds, underground utilities, sidewalk, signing, pavement markings and 1.85 miles of various intersections; from Canoe Creek Road (CR 523) to Hickory Tree Road (CR15).
 

Flamingo Crossings Boulevard/Hartzog Road

  • Year: 2012
  • Client:
  • Location: Lake Buena Vista
  • Contract Amount: $9,214,191.00
  • Details: New road construction of 4 lane divided roadway, sidewalk, underground utilities, pavement markings, lighting and signing from Orange Lake to Flamingo Crossings Blvd.
 

Buena Vista Dr. at Hollywood Studios

  • Year: 2012
  • Client: Reedy Creek Improvement District
  • Location: Lake Buena Vista
  • Contract Amount: $2,263,000
  • Details: 0.62 mile of lane widening of Buena Vista Drive from Studio Drive to Victory Way, includes drainage, lighting, camera system, traffic separators, pavement markings, signage and irrigation.
 

Narcoossee Road Phase 1B, 2 & 3

  • Year: 2012
  • Client:
  • Location: Saint Cloud
  • Contract Amount: $20,551,900
  • Details: From Jack Brack Road to Boggy Creek Road; 6 miles urban widenening from two-lane rural section to a four-lane divided urban section, bike paths, concrete medians, retention ponds, reuse water mains, water mains, force mains, gravity walls, lighting, signing, pavement markings, major bridge and multiple intersection improvements.
 

Tavistock Blvd East & West

  • Year: 2012
  • Client: Greeneway Improvement District
  • Location: Orlando
  • Contract Amount: $5,524,832.00
  • Details: New Road Construction for residential subdivision from Sloane Rd. to Country Road 15; excavation, grading, drainage, sidewalk, curb, base, paving and underground utilities.
 